Bachman Lake Is Being Rebuilt From Its Edges First

The newest pavement at Bachman Lake runs across the top of a dam built in 1901. The City of Dallas cut the ribbon on the $45 million Bachman Lake Dam and Spillway rehabilitation on March 31, 2026. The work included dredging the lake to remove built-up sediment and add depth for rowing and fishing, plus a widened, ADA-accessible trail over the dam.

That stretch is a good place to start, because it shows how the lake is changing. The work finished or underway around Bachman sits on its edges: the dam, a trail along Lemmon Avenue, a sidewalk going in on Northwest Highway, and a trail link toward Irving that is under study. The plan for the lake itself comes last. For anyone who walks or runs here from Bluffview, the lake is becoming the hub of a larger trail network before it has a vision of its own.

A Lake With No Plan of Its Own

The baseline matters here. In an August 2026 editorial, The Dallas Morning News pointed out that White Rock Lake has had about a dozen comprehensive plans, the first dating to 1936. Bachman Lake has never had one.

Friends of Bachman Lake made the case for a master plan to the Park Board in 2023. In August, the group's president, Ryan Moore, told the News that the city was finalizing a contract with a design firm. So the master plan is still ahead. In the meantime, the projects on the perimeter keep landing, each funded and run by a different agency: the dam by Dallas Water Utilities, the Lemmon trail by aviation money, the Campion link by Dallas County. Each one connects the lake to something beyond its shoreline.

The Edges, Walked Counterclockwise

If you start near the recreation center and work around, here is what has changed and what is still in motion as of early November 2026.

  1. The loop near the recreation center and Denton Drive. The Bachman Lake Park Loop Trail closed in the summer of 2025 near the recreation center and along Denton Drive for improvements. By this past summer, smooth sidewalk led up to the embankment above the lake, across from DART's operations facility and the Northwest Transfer Station Collection Center.
  2. The dam. The widened, ADA-accessible path over the rehabilitated dam is open, and the dredging was designed to give rowers and anglers deeper water.
  3. The Lemmon Avenue trail. This walking and biking trail runs along Lemmon Avenue with newly planted trees and a lookout for plane spotters. The News reported that it was paid for by the city's aviation construction fund. According to Friends of Bachman Lake, the trail meets the Bachman Trail at the Shorecrest crossing and pairs with Midway Manor Park, a pocket park dedicated at an October 2025 ceremony. That park came out of a collaboration among the Aviation Department, the Dallas Park and Recreation Department, and the Dallas Mavericks, who contributed a Mavs-themed basketball court.
  4. Northwest Highway's north side. A new sidewalk is going in on the north side of the highway, next to the open field in the airport's runway protection zone near Sam's Club. Friends of Bachman Lake first asked for sidewalks and crosswalks at a meeting at Bachman Lake Library about seven years ago. The group's September 2026 newsletter says the crosswalks are funded but not yet built.
  5. The corner at Marsh Lane, Lemmon Avenue and Northwest Highway. This is where a long-promised trailhead is supposed to go, and it is the slowest of the five.

The Corner That Waited Eight Years

The trailhead dates to a 2018 agreement. As Robert Wilonsky laid out in a May 2026 Dallas Morning News column, the Dallas City Council traded QuikTrip an acre of unused parkland where northbound Lemmon exits onto Northwest Highway. In return, QuikTrip promised a Bachman Lake trailhead, wider lighted paths beneath the bridges, security cameras, water fountains, bike racks, new trees and a new turn lane on Lemmon.

Two details from that column show what is at stake. The path under the Lemmon Avenue bridge is slated to widen from 4 feet to 12 feet. The trailhead is now priced at around $1 million, and the column notes the city was never going to spend that on this end of the lake by itself. City park planners told the News the holdup was a chain of approvals. Dallas Water Utilities had to sign off on pouring more concrete in the floodplain, and the Texas Department of Transportation had to approve the Northwest Highway turn lane.

By September, Friends of Bachman Lake reported that ground was moving for the QuikTrip facility at the corner. The group noted that the landscaping and the trailhead, which will make it easier to reach the Bachman Lake Trail from Northwest Highway, are part of what QuikTrip agreed to build. The site work is for the facility. The trailhead is the piece the lake's walkers are waiting for, and it is still to come.

When the News asked about it in August, Moore stayed patient:

"Surely it can't be much longer."

Moore said that in the Dallas Morning News editorial, which also described the dirt trail at this end of the lake that winds toward the Bachman Creek Greenbelt.

Where the Edges Are Headed

The far end of this network is in Irving, and that is where the edges-first pattern adds up to something. Friends of Bachman Lake reported in its October 2026 newsletter that Phase 1B of Irving's Campion Trail is now complete. The 1.8-mile segment runs along the Elm Fork of the Trinity River, past Frazier Dam and a mile beyond State Highway 183, and it links Irving's trail to the Dallas trail system.

Campion Trail segment Length Status per Friends of Bachman Lake, October 2026
Elm Fork, north 8.5 miles Open
West Fork, south 6.5 miles Open
Unification Phase 1A 0.9 mile Completed December 2023
Unification Phase 1B 1.8 miles Just completed
Unification Phase 2, final connector Not listed Targeted for late 2027
Full system 22 miles Targeted for end of 2028

The link from Bachman to Campion is earlier in the process. Dallas County picked the engineering firm IEA Inc. to study a connection between the two trails. County officials told the News the study will take about two years and weigh five possible routes through the corridor. If it gets built, the Friends group notes, the route would run from the Lemmon Avenue trail along the Bachman Trail and onto the Campion Trail, which is planned to reach as far as downtown.

The Lemmon trail, the dam path and the future trailhead each look modest on their own. Together, they are the on-ramps to a north-south corridor that Bachman Lake has never been part of.

This Fall at the Lake

The Bachman Creek Greenbelt, reached from the Northwest Highway end of the lake toward the Webb Chapel bridge, is where Friends of Bachman Lake has been asking people to look closely this fall. The group's October newsletter says this is the season for bird and monarch butterfly migration through the area, and it has started its own iNaturalist project so walkers can log what they spot on the Greenbelt. The group's volunteer work there ties into the slower side of the lake's story. Its newsletters describe cleanups with Greenspace Dallas to clear invasive privet from areas planted with native vegetation.

For something more social, Friends of Bachman Lake has hosted a fourth-Wednesday meet-and-greet at On Rotation Brewery and Kitchen. The most recent one was October 28, and the group notes that dates can change.

On Saturday, November 7, the Bee Happy 5K and 10K is listed for Bachman Lake Park at 3500 W. Northwest Highway. The listing also includes a 1-mile fun run and a kids' dash, with a 9 a.m. race start. That same afternoon, a few minutes south on Lovers Lane, Inwood Village holds its first Village Stroll from 2:30 to 5:30 p.m., with live music, sidewalk art and free craft activities. We covered what is changing on that block in our piece on Inwood Village's new neighbors.

What the Master Plan Will Inherit

Bachman Lake's first master plan will arrive after a rebuilt dam, a Lemmon Avenue trail with a plane-spotting lookout, a new Northwest Highway sidewalk, a trailhead corner where work has started, and a county study of five routes toward Irving. The News described the coming plan as something for the lake's ongoing projects to tether around. In practice, the edges have already settled where the connections go. The plan's job will be the middle: the loop itself, the recreation center side, and the dirt path toward the Greenbelt.

For the land side of the Bluffview picture, see our Bluffview teardown math.

If you are planning a home in Bluffview and want it to open toward the lake's trees and morning light rather than turn its back to them, S&R Development can walk the lot with you and start the design from what the site already offers. Contact us to set up a visit with Saad Chehabi.

WORK WITH US

We are recipients of numerous awards for the design and quality of our custom homes including being named one of Dallas' Best by D Magazine.

Contact Us